Umm Kulthum – Beit Hanina, Jerusalem
Road paving project in Beit Hanina neighborhood, under Master Plan 7158A. Work included paving a road connecting Abd al-Hamid Shouman Street to Al-Mamoun Street, earthworks for road opening, curb stone construction, road structure and sidewalk construction, lighting and additional infrastructure along Al-Munzer and Al-Munzer Alley 6 streets. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision.

Taha Hussein / Khalil Al-Sakakini – Beit Hanina
Drainage line and supporting infrastructure installation project in Beit Hanina neighborhood, along Al-Zeitouneh, Khalil Al-Sakakini, Nour Al-Huda, Taha Hussein, Al-Biruni, Al-Nahil, and Oqba bin Nafe streets. Work included water and sewage infrastructure, lighting, landscaping, road structure and sidewalk construction, and full coordination of all systems. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Completed and opened to the public in 2024.

Zayed bin Thabit – Shuafat, Jerusalem
A project for paving a new road on Zayed bin Thabit Street in Shuafat, Jerusalem. The work included installation of drainage, water, and sewage lines, lighting and landscaping work, construction of road structure and sidewalks, and coordination of various infrastructure systems. The project was managed from the planning stage through to completion, including preparation of cost estimates, budget control, and ongoing engineering supervision. The road opened to public use in 2024.

Rehaniya – Historic Village Core
A development and upgrade project for an active tourism and recreation site in Rehaniya village, Upper Galilee. The work included paving, walls, irrigation system, landscaping, artistic installations, signage, and electrical work. The project was executed while maintaining continuous public activity at the site and safe passage for citizens throughout the execution period. Special sensitivity was required for the environment containing ancient structures and heritage remains, which were protected and preserved throughout all work stages. The project was managed from the planning stage through to completion, including preparation of cost estimates, budget control, and ongoing engineering supervision.

Churches Road, Kafr Kanna
A renovation and development project for Churches Road in Kafr Kanna, Lower Galilee, designed to upgrade infrastructure, improve accessibility, and strengthen the tourist character of the area. The work included upgrading of lighting, drainage, water, and sewage systems, alongside development works including paving, landscaping, installation of shading elements, street furniture, and safe pedestrian crossings. The project was executed in an active urban environment including businesses, public institutions, and historic sites, with ongoing coordination with the local authority, residents, and business owners. The work was completed within four months according to schedule, while maintaining full public accessibility throughout the execution period.

Construction Project of 80 Residential Units – Beitar Illit
Construction project for eight multi-family residential buildings on Yabia Omer Street in Beitar Illit (Block 39142, Plot 1), totaling 80 units (10 per building). Work included all construction stages from structural framework to completion and occupancy permit: electrical, lighting, plumbing, aluminum, tiling, drywall. Plus comprehensive development: public areas, infrastructure, walls, fences, stairs, landscaping, outdoor furniture.

Dahiyat al-Barid – Beit Hanina, Jerusalem
Installation project for a 2.5m diameter drainage conduit, approximately 260 linear meters long, in Dahiyat al-Barid, Beit Hanina, Jerusalem. Work included road structure, sidewalks, lighting, and additional infrastructure with full coordination of various systems. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2019.

19 Residential Units – Plot 114, Beitar Illit
A project for construction of five residential buildings on HaRav Shach Street in Beitar Illit, totaling 19 residential units. Four of the buildings include four residential units each, and an additional building contains three units. The work included excavation, structural framework construction, finishing work, complete site development, and wall construction, through to full completion and handover of the buildings.

Multi-Purpose Building – 2 Kaznelson Street, Givatayim
Construction supervision project for a mixed-use building at 2 Kaznelson Street, Givatayim: four basement levels, commercial floor, two office floors, and ten residential floors with 30 units. Work included shoring, structural framework, electrical and plumbing, wall construction, site development, and finishes through full completion and handover.

School and Daycare Center – Plot 404, Beitar Illit
Construction project for a girls' elementary school and daycare center at 23 Chabad Street, Beitar Illit. Work included excavation, shoring, structural framework, finishes, site development, and wall construction through full completion and handover of both buildings.

Al-Banias – Beit Hanina, Jerusalem
New road paving project on Al-Banias Street in Beit Hanina, Jerusalem. Work included drainage, water, and sewage line installation, lighting and landscaping, road structure and sidewalk construction, and full coordination of existing and new infrastructure systems. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2025.

Ahmad Al-Safadi – Beit Hanina, Jerusalem
New road paving project on Ahmad Al-Safadi Street in Beit Hanina, as part of the LANA project. Work included road structure and sidewalk construction, installation of water, sewage, drainage, electricity, lighting, and communications infrastructure to upgrade the urban space and improve area transportation accessibility. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2024.

Urban Plan 7622
A project for paving eight new roads in the Al-Sahl neighborhood, Shuafat, under Master Plan 7622. The work included paving of roads 101, 122, 129, 130, 136, 138, 139, and 143, alongside installation of drainage lines, water and sewage infrastructure, installation of lighting and landscaping systems, sidewalk paving, and full coordination of all infrastructure. The project was managed from the planning stage through to completion, including preparation of cost estimates, budget control, and ongoing engineering supervision. The roads opened to public use in 2023.

Al-Biruni Loop Road – Beit Hanina, Jerusalem
New road paving project along Al-Biruni Street in Beit Hanina, Jerusalem. Work included drainage, water, and sewage line installation, lighting and landscaping, road structure and sidewalk construction, and full infrastructure systems coordination. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2023.

Al-Baroudi – Beit Hanina, Jerusalem
New road paving project on Al-Baroudi Street in Beit Hanina, Jerusalem. Work included drainage, water, and sewage line installation, lighting and landscaping, road structure and sidewalk construction, and infrastructure systems coordination. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2022.

Engineers' Housing Estate – Beit Hanina, Jerusalem
A project for paving a new road in the Engineers' Housing Estate in Beit Hanina, Jerusalem. The work included installation of drainage, water, and sewage lines, lighting and landscaping work, construction of road structure and sidewalks, and coordination of various infrastructure systems. The project was managed from the planning stage through to completion, including preparation of cost estimates, budget control, and ongoing engineering supervision. The road opened to public use in 2020.

Al-Sadaqa – Beit Hanina, Jerusalem
Drainage conduit construction project on Al-Sadaqa Street in Beit Hanina, Jerusalem. Work included road structure, sidewalks, retaining walls, and additional infrastructure with full coordination of various systems to ensure efficient water management and improve area transportation and safety. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened for public service in 2019.

Construction Project of 13 Residential Units – Hadagan Neighborhood, Efrat
Construction project for six attached townhouses in the Hadagan neighborhood in Efrat, totaling 13 units. Five buildings with two units each, and one building with one unit. Work included excavation, structural framework, finishes, complete site development, and wall construction through full completion and handover.

Elementary School for Boys – Plot 433, Beitar Illit
Construction project for a boys' elementary school with 16 classrooms and 6 kindergarten classes on Admor of Vizhnitz Street, Beitar Illit. Work included excavation, structural framework, finishes, site development, and wall construction through full completion and handover.

Jisr Al-Nasif – Beit Hanina, Jerusalem
New road paving project on Jisr Al-Nasif Street in Beit Hanina, under Master Plan 3458A, along a thawed land route. Work included drainage infrastructure, lighting, water and sewage line installation, landscaping, road structure and sidewalks. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2025.

Urban Plan 4522 – Al-Hawara, Shuafat, Jerusalem
New road paving project on Al-Hawara Street in Shuafat, under Master Plan 4522. Work included earthworks for road opening, curb stone construction, drainage, water, and sewage line installation, lighting and landscaping, road structure and sidewalk construction. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2024.

Road 122, Shuafat, Jerusalem
Roud 122 paving project in the Al-Sahl neighborhood, Shuafat, Jerusalem. Work included drainage, water, and sewage line installation, lighting and landscaping, road structure and sidewalk construction, and infrastructure systems coordination. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2023.

Holiday Lighting – Nazareth
Planning and supervision project for a festive lighting system throughout Nazareth, commissioned by the Government Tourism Corporation. Work included illuminating approximately 50 trees, church walls, and central plazas using linear fixtures and garlands with a smart control system for light intensity management. Managed from planning to completion while maintaining continuous public activity throughout.

Al-Jras – At-Tur, Jerusalem
A project for installation of drainage, water, and sewage lines on Al-Jras Street in At-Tur, Jerusalem, alongside construction of road structure and sidewalks. Full coordination of infrastructure systems was performed to ensure proper and efficient operation of all systems in the area. The project was managed from the planning stage through to completion, including preparation of cost estimates, budget control, and ongoing engineering supervision. The road opened to public use in 2021.

Al-Risala – Shuafat, Jerusalem
New road paving project on Al-Risala Street in Shuafat, Jerusalem. Work included drainage, water, and sewage line installation, lighting and landscaping, road structure and sidewalk construction, and full coordination of all area infrastructure systems. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2020.

Al-Aqaba – Beit Hanina, Jerusalem
New road paving project on Al-Aqaba Street in Beit Hanina, Jerusalem. Work included drainage, water, and sewage line installation, lighting and landscaping, road structure and sidewalk construction, and full coordination of area infrastructure systems. Managed from planning to completion with cost estimation, budget control, and ongoing engineering supervision. Opened to the public in 2019.

Girls' School – Plot 432, Beitar Illit
Construction project for a girls' school with 32 classrooms on Admor of Vizhnitz Street, Beitar Illit. Work included excavation, shoring, structural framework, finishes, environmental development, wall construction, and sports field installation through full completion and handover.

School for Special Education – Beitar Illit
Management and supervision project for special education school construction at 38 Rabbi Akiva Street, Beitar Illit. Work included excavation, structural framework, finishes, site development, wall construction, and coordination of all execution components through full completion and handover.